4.8Kn Mezzanine Floor, Lighting & Door opening knocked through with 1hr Rated Door.
Installed for our client The Tea Makers Of London in Dartford
4.8Kn Mezzanine Floor, Lighting & Door opening knocked through with 1hr Rated Door.
Installed for our client The Tea Makers Of London in Dartford